Skip to content
Sri Lanka InvestKenglobe Lanka

Sri Lanka Offshore Licensing Round 2026: Mannar Basin exploration blocks

Energy· 5 min read

Blocks on offer
4 (2026-MB-01 to 04)
Combined area
Approx. 33,964 km²
Water depth
About 100–3,000 m
Bid deadline (as published)
2 February 2027
Sri Lankan coastline, illustrating the country’s offshore energy setting

The Government of Sri Lanka has opened a competitive offshore exploration licensing round for 2026, designated SL2026-01 and administered by the Petroleum Development Authority of Sri Lanka (PDASL) under the Petroleum Resources Act No. 21 of 2021. Official announcements describe it as an opportunity for qualified international and domestic energy companies to bid for acreage in the Mannar Basin, off the west coast.

This article summarises investor-relevant facts published by PDASL, in our own words. Some dates in the official timetable are already in the past as of mid-November 2026; later announcements may still change remaining deadlines. For guidance, contact Kenglobe Lanka — we do not publish third-party application routes or contact details on this page.

The acreage on offer

Four blocks are offered, with a combined area of about 33,964 km²:

Block Area Water depth (as published)
2026-MB-01 5,948.95 km² About 100–2,000 m
2026-MB-02 5,689.05 km² About 100–2,500 m
2026-MB-03 10,597.67 km² About 100–3,000 m
2026-MB-04 11,728.30 km² About 100–3,000 m

The Mannar Basin sits west of Sri Lanka and south-east of India. Official descriptions place it in the broader Cauvery system, as an intra-cratonic failed rift linked to the break-up of Gondwana. The India–Sri Lanka maritime boundary is said to divide the basin nearly in half, with the Sri Lankan side covering about 42,000 km². Much of the basin lies in water depths of more than 1,000 m, increasing to about 3,000 m in the south. Sri Lanka’s wider offshore petroleum province also includes the Cauvery and Lanka Basin areas; this round’s offered acreage is in the Mannar Basin.

What exploration has already shown

PDASL describes the Mannar Basin as Sri Lanka’s most prospective offshore basin, explored for more than five decades. Drilling of the Dorado and Barracuda wells confirmed a working petroleum system, and Sri Lanka’s first offshore natural gas discoveries were made in 2011. A later official briefing notes that Cairn Lanka drilled four exploration wells between 2011 and 2013, with Dorado and Barracuda encountering gas and condensate.

Official “why invest” points include mature source rocks, effective migration, high-quality reservoirs, regional seals and working traps; remaining upside in lightly explored parts of the basin; a domestic gas market in the power and industrial sectors; and a stated role for Mannar gas in coal displacement, renewable integration and lower-emission supply. Published petroleum-system elements include mature shales (source), clastics and carbonates (reservoir), shales and evaporites (seals), and structural and stratigraphic traps.

Technical data cited in official materials include more than 11,000 line km of 2D seismic, limited conventional 3D seismic in West Mannar, well data for calibration, basin studies and reports, and about 40,000 km² of enhanced subsurface imaging derived from 2D seismic. Available petroleum information is also described as including seismic, gravity, gravity-gradiometry, magnetic and well data, with some modern processing and reprocessing.

Timetable (as published — some dates are already past)

As of the official announcements reviewed in mid-November 2026:

  • 25 August 2026 — licensing round announced; bid documents issued.
  • Data room — the 25 August launch announcement said the data room would be available from 1 September 2026; a later official timetable lists the data room as opening on 25 August 2026. We cannot reconcile those two published dates from the materials alone.
  • 29–30 September 2026 — international investor roadshow opening in London (now past).
  • 21 October 2026 — virtual investor briefing (now past).
  • 16–17 November 2026 — investor engagement in Kuala Lumpur, at the Asia Petroleum Geoscience Conference & Exhibition 2026 (imminent or ongoing relative to this article).
  • 12 January 2027 — deadline for bid clarification requests.
  • 2 February 2027 — final deadline for submission of bids, and the date listed for the opening of bids.

Notification of successful bidders and the signing of Petroleum Resources Agreements were still to be announced.

PDASL is the statutory regulator for petroleum exploration, development and production, operating under the Ministry of Energy and established under the Petroleum Resources Act No. 21 of 2021. Official FAQs also note upstream local-content guidelines covering employment, training, skills development for Sri Lankan nationals, technology transfer and participation by Sri Lankan businesses.

A published summary of the Model Petroleum Resources Agreement (updated 1 September 2026) lists, as illustrative highlights only:

  • an exploration period of up to eight years, in three phases of 3 + 2 + 3 years;
  • petroleum operations to commence within six months of the effective date;
  • a performance bank guarantee equal to 25% of total LMS for the entire minimum work programme (LMS is not spelled out in the published summary);
  • a minimum signature bonus of USD 500,000;
  • a government option to take profit petroleum in cash or in kind;
  • a possible extension of the exploration period by up to 24 months to complete an appraisal programme, subject to the agreement.

The fiscal framework is described as including royalty, cost recovery, profit sharing, tax and duties, stabilisation provisions and bonuses. Official materials state that the full model agreement and the applicable laws prevail over any website summary. After bids are submitted, they are evaluated against published criteria; successful investors then enter into a Petroleum Resources Agreement and obtain the required licence, following any negotiations and approvals.

How Kenglobe Lanka can help

This is a government licensing process for qualified upstream companies, not a real-estate listing. If you are assessing whether the Mannar Basin round is relevant to your investment programme, Kenglobe Lanka can provide guidance and help you engage with the official process.

Write to sh@kenigs.com or message us on WhatsApp.

Figures and dates are as published by PDASL and may be updated. This page is general information, not investment, legal or technical advice, and it is not an invitation to bid.

Source: Petroleum Development Authority of Sri Lanka (PDASL) — official Licensing Round 2026 announcements (as of mid-November 2026)

Also available in Hebrew →

Frequently asked questions

What is the Sri Lanka Licensing Round 2026?

It is an international competitive process through which the Government of Sri Lanka, via the Petroleum Development Authority of Sri Lanka (PDASL), invites qualified companies to evaluate and bid for offshore petroleum exploration opportunities in the Mannar Basin. The round is designated SL2026-01.

Which blocks are on offer?

Four blocks: 2026-MB-01 (5,948.95 km², water depths of about 100–2,000 m), 2026-MB-02 (5,689.05 km², about 100–2,500 m), 2026-MB-03 (10,597.67 km², about 100–3,000 m) and 2026-MB-04 (11,728.30 km², about 100–3,000 m). Together they cover approximately 33,964 km².

Have hydrocarbons already been found in the Mannar Basin?

Yes. Official materials state that exploration drilling in 2011 confirmed natural gas and condensate. The Dorado and Barracuda wells encountered gas and condensate, demonstrating a working petroleum system. Cairn Lanka drilled four exploration wells between 2011 and 2013.

What are the key dates?

As published by PDASL: the round was announced and bid documents were issued on 25 August 2026. One launch announcement said the data room would be available from 1 September 2026; a later official timetable lists the data room as opening on 25 August 2026. Investor engagements included London on 29–30 September 2026 and a virtual briefing on 21 October 2026 (both now past). An investor engagement in Kuala Lumpur is listed for 16–17 November 2026. The bid clarification request deadline is 12 January 2027. The final deadline for submitting bids, and the opening of bids, is 2 February 2027. Dates for notifying successful bidders and signing Petroleum Resources Agreements were still to be announced when these materials were reviewed.

Who can take part?

Official materials say the round is intended for suitably qualified companies with the technical, financial and operational capability to undertake offshore petroleum exploration and development. Consortium participation is subject to the official documentation. Full qualification rules are set out in the government’s licensing documents.

What legal and commercial terms apply?

Petroleum exploration is principally governed by the Petroleum Resources Act No. 21 of 2021, with PDASL (under the Ministry of Energy) as the regulator. A Model Petroleum Resources Agreement (updated 1 September 2026) summarises, illustratively, an exploration period of up to eight years in three phases (3 + 2 + 3 years), operations to start within six months of the effective date, a performance bank guarantee equal to 25% of total LMS for the minimum work programme, a minimum signature bonus of USD 500,000, a government option to take profit petroleum in cash or in kind, and a possible extension of up to 24 months to complete an appraisal programme. The fiscal framework is described as including royalty, cost recovery, profit sharing, tax and duties, stabilisation provisions and bonuses. Official materials stress that the full model agreement prevails over any summary.

How can I get guidance on this opportunity?

Contact Kenglobe Lanka at sh@kenigs.com or on WhatsApp. We can help qualified investors understand the opportunity and guide them through the official process. We do not publish third-party application portals or direct filing instructions on this site.

Related reading

Travel & visas

A 7- to 10-day Sri Lanka itinerary for Israeli travellers

Ten days is enough for a balanced route from Colombo to Kandy and tea country, then a safari and a finish on the south coast. Seven days means a conscious cut — usually fewer beach days or skipping a region — and should be built around the season, not as a race between sights.

Read more

Travel & visas

When is the best time for Israelis to visit Sri Lanka?

There is no single “best” month for the whole island. December–March is especially comfortable for the south and west coasts; July–September suits the east coast and safari. October is usually the least settled month. Build the route around the region, not only the departure date from Israel.

Read more

Travel & visas

How to combine a Sri Lanka investment trip with a tour

A business visit to Colombo can grow into a few tour days — Sigiriya and Kandy, tea country, or the south coast — without turning the whole week into back-to-back meetings. Keep a recovery day after the flight, cluster meetings in Colombo or Port City, and plan the touring days in a single stretch, matched to the season.

Read more

Free initial consultation

Ready to invest in Sri Lanka?

Speak with our team in Israel or Colombo for the full brief, documents and a discreet site visit.

Request a consultation